New CA Building Standards |
LEED Certification |
|
|
|
Mandatory standards in 2010 code |
26-32 points = LEED
certified;
33-38 = LEED Silver: 39-51 = LEED Gold;
52-69 = LEED Platinum. |
|
|
Site Planning |
Requires storm
water drainage and retention during construction |
Requires
Construction Activity Pollution Prevention |
|
|
|
|
1 point for Site
Selection |
|
|
|
|
1 point for
Development Density & Community Connectivity |
|
|
|
|
1 point for
Brownfield Redevelopment |
|
|
|
|
1 point for
Alternative Transportation: Public Transportation Access |
|
|
|
Bicycle storage
and changing rooms are specified in Appendix Section A406.1.3.1. |
1 point for
Alternative Transportation: Bicycle Storage & Changing Rooms |
|
|
|
Fuel efficient
vehicle provisions are specified in Appendix Section A406.1.5. |
1 point for
Alternative Transportation: Low Emitting & Fuel Efficient Vehicles |
|
|
|
Reduction of
parking capacity is specified in Appendix Section A406.1.6. |
1 point for
Alternative Transportation: Parking Capacity |
|
|
|
|
1 point for Site
Development: Protect or Restore Habitat |
|
|
|
|
1 point for Site
Development: Maximize Open Space |
|
|
|
Storm water runoff
rate and quantity is specified in Appendix Section A406.1.3.1. |
1 point for Storm
water Design: Quantity Control |
|
|
|
Storm water runoff
quality is specified in Appendix Section A406.1.3.2 |
1 point for Storm
water Design: Quality Control |
|
|
|
|
1 point for Heat
Island Effect: Non-Roof |
|
|
|
|
1 point for Heat
Island Effect: Roof |
|
|
|
|
1 point for Light
Pollution Reduction |
|
|
Energy Efficiency |
Tier 1 - 15% Above
current energy standards. Tier 2 - 30% Above current energy
standards. |
1 point for10.5%
above current standards. Increases up to 10 points if you go 42% above
current standards. |
|
|
|
All appliances
have to be ENERGY STAR. |
Unknown. |
|
|
|
Requires building
commissioning. |
Requires
fundamental commissioning.
1 point for enhanced commissioning.
|
|
|
|
Requires optimum
building orientation and shading |
|
|
|
|
Requires onsite
renewable energy. |
1 point for onsite
renewable energy. |
|
|
|
Reduce energy
demand of elevators. |
|
|
|
|
Requires the
design of steel framing for maximum energy efficiency.
|
|
|
|
|
Requires use of
HVACs and fire suppression systems that do not use HFCFs and Halons |
1 point for
Enhanced Refrigerant Management |
|
|
|
Requires
electronic measurement and verification as part of commissioning. |
1 point for
Measurement & Verification |
|
|
|
Requires
participation in a green power program offered by local utility. |
1 point for Green
Power |
|
|
Water |
Requires 20%
reduction in water use. |
1 point for 20%
water use reduction. 1 point for 30% water use reduction. |
|
|
|
Require 50%
reduction in water use reduction for landscaping. Option for 100%.
|
1 point for 50%
water use reduction for landscaping. 1 additional point for 100%
water use reduction for landscaping. |
|
|
|
Requires water sub
meter for indoor and outdoor water uses. |
|
|
|
|
Requires reduction
of water use by appliances that use water. |
|
|
|
|
Requires
wastewater reduction generated by the building. |
1 point for
wastewater building sewage conveyance by 50%. |
|
|
|
Requires building
to be dual plumbed for potable and recycled water systems.
|
|
|
|
Materials &
Resources |
Requires onsite
storage and collection of recyclables. |
Requires onsite
storage and collection of recyclables |
|
|
|
Deconstruction and
Reuse of Existing Structures is specified in Appendix Section A405.1.
|
1 point to
maintain 75% of existing walls, floors and roofs. Additional point
for maintaining 95% of existing walls, floors and roofs.
|
|
|
|
Requires diverting
at least50% construction waste from landfills or meet local land
ordinance, whichever is more stringent. |
1 point for
diverting 50% construction waste from landfills. Additional point for
diverting 75%. |
|
|
|
Requires 100% of
trees, stumps, rocks and associated vegetation to be used or recycled. |
|
|
|
|
Requires minimum
reuse of 5% of building materials. |
1 point for
reusing 5% of building materials. Additional point for reusing 10% of
building materials. |
|
|
|
Requires 10% use
of recycled materials. |
1 point for use of
10% recycled materials. Additional point for use of 20 % recycled
materials. |
|
|
|
If comparable, use
materials from California or within 500 miles from site for 10% of
materials value. |
1 point for using
regional materials in 10% of the project. Additional point for using
regional materials in 20% of the project. |
|
|
|
Requires use of
2.5% of rapidly renewable materials. |
1 point for using
rapidly renewable materials for 2.5% of all building materials.
|
|
|
|
Requires use of
50% of building components to be certified wood. |
1 point for using
50% certified wood. |
|
|
|
Requires 10% use
of recyclable materials. |
|
|
|
|
Requires use of
cement and concrete made with recycled products. |
|
|
|
|
If comparable, use
materials with enhanced durability |
|
|
|
|
Requires water
resistance and moisture management of the building.
|
|
|
|
|
Permit use of
advanced wood framing techniques that meet Title 24, Part 2. |
|
|
|
|
Select materials
assemblies based on Life Cycle Assessment. |
|
|
|
|
Deconstruction and
Reuse of Existing Structures is specified in Appendix Section A405.1. |
1 point for
Building Reuse: Maintain 50% of Interior Non-Structural Elements |
|
|
Environmental Quality |
Requires outside
air ventilation that meets Title 24, Parts 6 and 8 or local ordinance. |
Requires that you
must meet the indoor air quality requirements of ASHRAE 62.1-2004.
|
|
|
|
Requires ETS
control. |
Requires
Environmental Tobacco Smoke (ETS) Control |
|
|
|
Requires outside
air ventilation that meets Title 24, Parts 6 and 8 or local ordinance. |
1 point for
outdoor air delivery monitoring system. |
|
|
|
|
1 point for
increased ventilation that is 30% above ASHRAE 62.1-2004.
|
|
|
|
Requires CO2
monitoring in accordance with Title 24, Part 6. |
|
|
|
|
Requires temporary
ventilation during construction. |
1 point for indoor
air quality management plan during construction. |
|
|
|
Requires building
flush-out post-construction. |
1 point for indoor
air quality management plan before occupancy. |
|
|
|
Requires finish
material pollutant control. |
1 point for
reducing the quantity of indoor air contaminants. |
|
|
|
Requires low
emitting paints and coatings. |
1 point for low
emitting indoor air contaminants for paints and coatings.
|
|
|
|
Requires low
emitting carpet systems. |
1 point for low
emitting indoor air contaminants for carpet systems. |
|
|
|
Requires
low-emitting resilient floor systems. |
|
|
|
|
Requires
low-emitting thermal insulation. |
|
|
|
|
Requires low
emitting acoustical wall and ceiling panels. |
|
|
|
|
Requires
low-emitting composite wood , including agrifiber products and
adhesives. |
1 point for low
emitting indoor air contaminants for composite wood and agrifiber
products. |
|
|
|
Requires indoor
pollutant source control at entryways and in specified rooms. |
1 point for indoor
pollutant source and chemical control. |
|
|
|
Requires lighting
controllability by occupants. |
1 point for
controllability of lighting systems. |
|
|
|
Requires thermal
comfort control by occupants. |
1 point for
controllability of thermal comfort systems. |
|
|
|
Requires thermal
comfort design complying with ASHRAE 55-2004. |
1 point for
thermal comfort design. |
|
|
|
Requires
post-occupancy verification of indoor environmental quality. |
1 point if you
provide verification of thermal comfort design. |
|
|
|
Requires daylit
spaces meeting Title 24, Part 6 and provide views for 90% of building
occupants. |
1 point if you
provide 75% of spaces with daylight and views. Additional point if
you do 90% of the spaces with daylight and views. |
|
|
|
Requires
acoustical control for exterior and interior sound control. |
|
|
|
|
|
1-4 points for
innovation and design process. |
|
|
|
|
1 point for use of
a LEED accredited professional on your project. |